Energonuclear – Current status
EPC procedure in place; Updating Process for Site PSHA – Finalized; The related IAEA Expert mission – finalized, with positive conclusions; Financial Model- in preparation; Strategy for Construction License – approved by CNCAN; Content of support documents for Letter of Comfort – approved by CNCAN. Obtaining from CNCAN the Letter of Comfort is the previous stage before the application for construction license and has the main scope to demonstrate the investors that CNCAN considers the project licensable; Safety assessment of the impact of design changes proposed in the Licensing Basis Documents for Units 3 and 4 similar with stress analysis reports-in progress.
Units 3 & 4 Project
S.C. EnergoNuclear S.A. (EN) is the company in charged with construction, commissioning and operation of Units 3&4. EN is a vehicle for promotion of Units 3 and 4 investment putting into application the investors’ decisions. In present, EN shareholders are as follows: S.N. Nuclearelectrica S.A. (84,65%), Enel Investment Holding B.V. (9,15%) and ArcelorMittal Galati S.A. (6,2%). The Government of Romania is involved in the development of the Project for Units 3 and 4 and currently he is looking for new investors in order to reduce the SNN’s shares. EnergoNuclear (EN) which was created in 2009 has been acting since then ...
Cernavoda 6 a Safe Technology
CANDU 6 is a safe technology with a successful track-record over the last decades. It was designed specifically for electricity production. This focused development is one of the reasons that CANDU reactors have such high fuel efficiency. The main characteristics of CANDU 6 reactor are: Natural uranium fuel Heavy water moderator Channel-type reactor On-power refuelling Fully automated operation Computer controlled CANDU 6 has an appropriate combination of inherent, passive, engineered and administrative safety characteristics •Reactivity control Control rods absorbers Poison injection •Shutdown of the reactor 2 fully capable shutdown systems •Control Rooms 2 control rooms (Main and Secondary Control Room) •Emergency Power Supply 2 Sets of Diesel Generators As part of ...
Energonuclear – Project Keypoints
According to the document Energy Strategy of Romania during the period 2007-2020 approved by Governmental Decision No. 1069/2007 one of priorities of energy production strategy is to continue the nuclear energy program by finalizing Units 3 and 4 of Cernavoda NPP. In this respect, Cernavoda Units 3 and 4 keypoints are: Proven technology Licensable design EU positive opinion O&M experience Existing infrastructure Existing assets Authorized site Main achievements in EN activity are the following: EC positive opinion in relation with Project (Euratom Treaty Art. 41); Licensing Basis Documents and Safety Design Guides approved by CNCAN; Safety Goals (CDF, LRF, Seism) meet requirements for new build projects; Applicable codes and standards ...
Articles
Units 3 & 4 Project
S.C. EnergoNuclear S.A. (EN) is the company in charged with construction, commissioning...
Energonuclear – Project Keypoints
According to the document Energy Strategy of Romania during the period 2007-2020...
Energonuclear – Current status
EPC procedure in place; Updating Process for Site PSHA – Finalized; The related...
Read More ArticlesTechnology
Cernavoda 6 a Safe Technology
CANDU 6 is a safe technology with a successful track-record over the last decades....
Cernavoda 3 & 4 Nature Frendly
The first nuclear power plant in Romania, operating at Cernavoda, is developed...
U 3&4 compliance with National and International Standards
Cernavoda 3&4 civil construction was started in the 1980s, but was later...
Read More ArticlesNews
In cadrul procesului de realizare a proiectului CNE Cernavoda Unitatile 3 si 4, SC EnergoNuclear SA, dezvoltatorul proiectului, a primit la data de 26.01.2012, data limita specificata in invitatia de participare,... [Read more of this review]
Studiu privind asigurarea apei de racire pentru U3&4 ale CNE Cernavoda Modalitate de desfasurare: Procedura offline Criteriu de atribuire: Pretul cel mai scazut CPV: 71335000-5 – Studii tehnice... [Read more of this review]
SC EnergoNuclear SA a primit scrisorile de intentie, in cadrul contractului de Inginerie, Procurare si Construcţie. In cadrul procesului de realizare a proiectului CNE Cernavoda Unitatile 3 si 4, SC EnergoNuclear... [Read more of this review]
Read More News