Energonuclear – Project Keypoints

noiembrie 12, 2011 by  
Filed under Article

According to the document Energy Strategy of Romania during the period 2007-2020 approved by Governmental Decision No. 1069/2007 one of priorities of energy production strategy is to continue the nuclear energy program by finalizing Units 3 and 4 of Cernavoda NPP.

In this respect, Cernavoda Units 3 and 4 keypoints are:

  • Proven technology
  • Licensable design
  • EU positive opinio
  • O&M experience
  • Existing infrastructure
  • Existing assets
  • Authorized site

Main achievements in EN activity are the following:

  • EC positive opinion in relation with Project (Euratom Treaty Art. 41);
  • Licensing Basis Documents and Safety Design Guides approved by CNCAN;
  • Safety Goals (CDF, LRF, Seism) meet requirements for new build projects;
  • Applicable codes and standards are established;
  • List of design changes are established; Radioactive waste management strategy completed;
  • Preliminary Decommissioning Plan completed;
  • Inspection of existing structures on Cernavoda NPP completed.